What This Installation Guide Covers

If you are an installer preparing to fit bird proofing under solar panels on a sloped roof, your first priority is establishing a safe work zone before handling any mesh material. This guide covers the prerequisites, step-by-step procedure, material constraints, and a pre-installation checklist tailored to sloped-roof applications—specifically for mesh-based exclusion systems that prevent birds from nesting under rooftop panels and reduce debris build-up [F:BGM-F-001]. Sloped roofs introduce two compounding risks: steep pitch angles that increase fall exposure and proximity to live DC wiring from the photovoltaic array. Both must be managed before the first clip is placed. [F:BGM-F-001]


Prerequisites Before Roof Access

Complete these items on the ground before any worker steps onto the roof.

Safety and Fall Protection Requirements

Electrical System Isolation

Material Verification


Installation Procedure on Sloped Roofs

Follow this sequence to minimize edge exposure time and maintain a controlled work environment.

Step 1: Pre-Install Location Marking

Step 2: Ground-Level Mesh Pre-Cutting

Step 3: Roof Access and Anchor Connection

Step 4: Mesh Attachment Along the Array Perimeter

Step 5: Edge Termination Cable and Conduit Pathways

Step 6: Final Walk-Down and Retreat from Roof


Material Constraints and Limitations

Installers must understand what the mesh system can and cannot do before advising customers.


Pre-Installation Checklist for Sloped Roofs

Use this checklist on-site before any installation begins:


When to Escalate

Stop work and escalate to a project manager or structural engineer if you encounter any of these situations:


Summary

Safe bird proofing installation on sloped roofs depends on three non-negotiables: verified fall protection, locked-out electrical systems, and a material plan that is staged on the ground and attached methodically in the air. The mesh exclusion system prevents birds from nesting under rooftop solar panels and reduces debris build-up, but it does not replace the installer’s obligation to isolate DC power and manage roof-edge exposure. Complete the first-installation checklist on every job, and escalate when substrate, electrical, or material conditions exceed the expected parameters. A conservative approach—one that protects the worker first and the mesh second—produces both a safe crew and a durable installation. [F:BGM-F-001]


Frequently Asked Questions for Installers

Q: Do I need to cover the solar panels before installing mesh?
Yes, cover the entire array with opaque tarps if you will be working directly beneath the modules. Even with the inverter off, panels generate voltage in daylight. Tarps also protect the panel surface from tools and kneeling. [F:BGM-F-001]

Q: Can I attach mesh clips to the roof shingles themselves?
No. Clips are designed for the panel frame only. Attaching mesh to shingles or the roof deck can compromise the roofing material and will likely void manufacturer warranties. [F:BGM-F-010]

Q: What is the minimum pitch this installation procedure covers?
The procedure applies to slopes greater than 2/12. Steeper pitches (above 6/12) require additional fall protection rigging and should only be attempted by crews with certified steep-slope experience. [F:BGM-F-017]

Q: How many crew members are required for safe installation?
A minimum of two people: one certified in fall protection rescue and one to manage material passes from the ground to the roof staging area. Never work alone on a sloped roof. [F:BGM-F-005]